Test lab log

No lab tests have been completed yet.

This page is the public record of every test we run — and right now it is empty on purpose. A test log that starts empty is honest; a site that claims tests it never ran is not.

The lab is the product. A checker can be copied in an afternoon; fifty dated tests with photos, shutdown times and wattmeter readings cannot. This page will hold them all.

Planned tests — in order

#UPSNAS / OSWhat it will proveStatus
1APC BE600M1Synology DS923+ / DSM 7.4.1Detect, driver, shutdown time, runtime at ~45 WPlanned
2CyberPower CP1500PFCLCDSynology DS923+ / DSM 7.4.1Detect, driver, shutdown time, runtime at ~45 WPlanned
3UGREEN US3000UGREEN DXP4800 Plus / UGOS ProDetect, shutdown, runtime at ~35 WPlanned
4CyberPower CP1500PFCLCDMini PC / TrueNAS SCALE 25.10.4Detect, driver, shutdown timePlanned
5UGREEN US3000Mini PC / TrueNAS SCALE 25.10.4Confirm the NUT 2.8.0 non-detectionPlanned
6APC BE600M1Mini PC / Proxmox VE (NUT server)Detect, shutdown ordering with a guest VMPlanned

What each test will record

UPS model and SKU region (Indian 230 V SKUs will be labelled as such), NAS model and OS version, whether the UPS was detected, which driver, the shutdown time measured with a stopwatch, the runtime at the measured load, the date, and a photo or short video of the test. Failed tests are published too — a combination that does not work is as valuable as one that does.

Community reports

Until the lab opens, the matrix runs on sourced data: manufacturer lists, the NUT HCL and dated community reports. If you have tested a combination yourself, report it with the NAS model, OS version, UPS model and what happened, and it will be added to the matrix with you as the source. Two verified reports are enough for a combination to earn its own page.

Reviewed by Dharmen Bhambu · Last reviewed 29 November 2026. No lab tests have been completed yet — every verdict on this site shows its source. See how we check and the test log.